How do I evaluate the load steps of a fuel cell test automatically?¶
A load-step test holds the current at several levels and records the cell voltage. In UniPlot you detect the steps on the current channel with Find Plateaus… and then calculate one value per step with Plateaus (min/max…)…, both in Data=>More Data Functions…: for example the mean voltage and the hold time. The result is a table with one row per load step, without marking the steps by hand.
Plateaus Computation: a signal (green) averaged on each detected plateau (blue). The same is done with the cell voltage on each load step.¶
How it works¶
Load the current (or current density) and the cell voltage over time, for example with drag and drop from the Data Browser.
Select the current curve and choose Data=>More Data Functions… > Find Plateaus…. Set Y-Tolerance to the allowed variation of a step, the minimum plateau duration to the shortest valid hold time and Y-range for detection to the value range of the steps you want. Each step gets a number, the transitions are 0.
Click the plateau curve, hold Shift and click the voltage curve. Choose Data=>More Data Functions… > Plateaus (min/max…)…, select the plateau curve as Plateau signal, the voltage as Signal and the Computation
mean. With Create table dataset you get one mean voltage per load step.Repeat with
standarddeviationto check how stable the voltage was. For the hold time of each step, useend-startwith a curve of the time channel over time as Signal.Turn the results into a report table and use conditional formatting to flag steps that were held too short, see How do I highlight values outside the specification in a report table?.
Why it helps¶
The steps are detected by the same rules in every test, not by eye.
One table with mean voltage, hold time and stability per load step.
The same evaluation works for other stepped test profiles, for example battery charge and discharge steps or engine operating points.
Good to know¶
UniPlot has no special fuel cell module for this. The evaluation uses the general commands Find Plateaus and Plateaus Computation, new in R2026.3.
A step that contains missing values is not detected as one plateau.
The plateau curve and the voltage curve must have the same number of points, for example channels of the same measurement raster.
The voltage over current density of the step means is the polarization curve of the test.